42-363-32700

Final Completion

BOWMAN-STATE GAS UNIT

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · MINERAL WELLS (BIG SALINE)

RRC Lookup

Permits

1

Max Depth

4,200 ft

First Permit

1981-07-17

Latest Activity

1981-07-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-08-16

Shut-In

Plugged

1993-10-07

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: SEELY OIL COMPANY (reported 1993-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEELY OIL CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-10

Operator History

originally filed by SEELY OIL CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#125850 A SEELY OIL CO.
received 1981-07-17

Well Details

Well Number
2
Max Depth
4,200 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1981-08-16

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora