42-363-32885

Final Completion

SET RANCH

PALO PINTO County · District 7 · DALLAS PRODUCTION INC. · SET RANCH (CONGL)

RRC Lookup

Permits

1

Max Depth

4,766 ft

First Permit

1982-04-08

Latest Activity

1982-04-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-05-25

Shut-In

Plugged

1990-04-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#156106 A DALLAS PRODUCTION, INC.
received 1982-04-08

Well Details

Well Number
32
Max Depth
4,766 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1982-05-25

Operator

Location
DALLAS
P-5 Status
Y (filed 2020-12-04)
Cum Oil (all leases)
3,138,597 bbl
Cum Gas (all leases)
150,942,979 mcf
Total Permits
823

External Links

Live © 2026 Petrora