42-363-32928
Final CompletionRINGO E. C.
PALO PINTO County · District 7 · LINDLEY EDDIE · BIG SALINE (STRAWN)
Permits
1
Max Depth
3,800 ft
First Permit
1982-06-11
Latest Activity
1982-06-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-02-14
Shut-In
—
Plugged
2014-04-22
!
EWA / Permit operator mismatch
Scheduling: LINDLEY EDDIE ≠ Permit: AUSTEX ENERGY CO, INC
Resolved via: scheduling → LINDLEY EDDIE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2014-04
Operator History
originally filed by AUSTEX ENERGY CO, INC — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#163505 A AUSTEX ENERGY CO, INC
received 1982-06-11
Well Details
- Well Number
- 1
- Max Depth
- 3,800 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 7
- Operator
- LINDLEY EDDIE
- Completed
- 1983-02-14
Operator
- Name
- LINDLEY, EDDIE
- Location
- DESDEMONA
- P-5 Status
- Y (filed 2025-06-04)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf