42-363-33398

Final Completion

RINGO E. C. B

PALO PINTO County · District 7 · MCCOWN ENGINEERING · MONTY (CONGL. .UPPER)

RRC Lookup

Permits

1

Max Depth

4,100 ft

First Permit

1984-08-02

Latest Activity

1984-08-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-09-19

Shut-In

Plugged

2023-01-12

!

EWA / Permit operator mismatch

Scheduling: MCCOWN ENGINEERING ≠ Permit: CARPENTER, MICHAEL J., OPERATING

Resolved via: schedulingMCCOWN ENGINEERING

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2023-01

Operator History

originally filed by CARPENTER, MICHAEL J., OPERATING — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#247262 A CARPENTER, MICHAEL J., OPERATING
received 1984-11-05
#247262 A CARPENTER, MICHAEL J., OPERATING
received 1984-08-02

Well Details

Well Number
9
Max Depth
4,100 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1985-09-19

Operator

Location
WICHITA FAL, LS
P-5 Status
Y (filed 2018-12-07)
Cum Oil (all leases)
51,722 bbl
Cum Gas (all leases)
13,512 mcf
Total Permits
5

External Links

Live © 2026 Petrora