42-363-33431
Final CompletionTESCO
PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · LAX (CONGL)
Permits
1
Max Depth
4,500 ft
First Permit
1984-10-01
Latest Activity
1984-10-01
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-12-12
Shut-In
—
Plugged
1994-01-13
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WILLIAMS PETROLEUM COMPANY
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1994-01
Operator History
originally filed by WILLIAMS PETROLEUM COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#253278 A WILLIAMS PETROLEUM COMPANY
received 1984-10-01
Well Details
- Well Number
- 1
- Max Depth
- 4,500 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1984-12-12
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf