42-363-33497

Final Completion

LANGFORD -B-

PALO PINTO County · District 7 · HUNTER ENERGY INC. · JOHNSTON GAP (MARBLE FALLS)

RRC Lookup

Permits

1

Max Depth

4,200 ft

First Permit

1985-01-07

Latest Activity

1985-01-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-03-07

Shut-In

Plugged

1991-09-13

!

EWA / Production operator mismatch

Scheduling: HUNTER ENERGY INC. ≠ Production: CARPENTER, WALTER G. (reported 2001-04)

!

EWA / Permit operator mismatch

Scheduling: HUNTER ENERGY INC. ≠ Permit: CARPENTER, WALTER G.

Resolved via: schedulingHUNTER ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#263183 A CARPENTER, WALTER G.
received 1985-04-04
#263183 A CARPENTER, WALTER G.
received 1985-01-07

Well Details

Well Number
24
Max Depth
4,200 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1985-03-07

Operator

Location
HURST
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
26,240 bbl
Cum Gas (all leases)
979,682 mcf
Activities
OPRS/G, OPRS/O
Total Permits
11

External Links

Live © 2026 Petrora