42-363-33517

Final Completion

RITCHIE

PALO PINTO County · District 7 · DALLAS PRODUCTION INC. · METCALF GAP (BIG SALINE)

RRC Lookup

Permits

3

Max Depth

4,331 ft

First Permit

1985-01-17

Latest Activity

1989-12-01

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-04-18

Shut-In

Plugged

1997-04-16

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#366881 A DALLAS PRODUCTION, INC.
received 1989-11-27
#321738 A DALLAS PRODUCTION, INC.
received 1986-10-13
#264450 A DALLAS PRODUCTION, INC.
received 1985-06-14
#264450 A DALLAS PRODUCTION, INC.
received 1985-01-17

Well Details

Well Number
1
Max Depth
4,331 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1985-04-18

Operator

Location
DALLAS
P-5 Status
Y (filed 2020-12-04)
Cum Oil (all leases)
3,138,597 bbl
Cum Gas (all leases)
150,942,979 mcf
Total Permits
823

External Links

Live © 2026 Petrora