42-363-33525
INJECTIONRITCHIE JOHN
PALO PINTO County · District 7 · BJB TRANSPORT LLC · PALO PINTO CO. REG. (GAS)
Permits
4
Max Depth
4,200 ft
First Permit
1985-01-22
Latest Activity
1998-05-29
Lifespan
13 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
1995-02-16
Shut-In
—
Plugged
—
P-5 Org Status: X
!
EWA / Production operator mismatch
Scheduling: BJB TRANSPORT LLC ≠ Production: EVARADO OIL COMPANY (reported 2006-04)
!
EWA / Permit operator mismatch
Scheduling: BJB TRANSPORT LLC ≠ Permit: DYNAMIC PRODUCTION, INC.
Resolved via: scheduling → BJB TRANSPORT LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1996-06
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (4)
Permit Applications (4)
#432983 A DYNAMIC PRODUCTION, INC.
received 1998-04-14
#476650 A DYNAMIC PRODUCTION, INC.
received 1998-04-14
#432983 A JACKSON ENERGY DEVELOPMENT, INC.
received 1995-02-16
#264780 A RAW ENERGY CORPORATION
received 1985-01-21
Well Details
- Well Number
- 4
- Max Depth
- 4,200 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 7
- Operator
- BJB TRANSPORT LLC
- Completed
- 1995-02-16
Operator
- Name
- BJB TRANSPORT LLC
- Location
- WOODSON
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 1