42-363-33525

INJECTION

RITCHIE JOHN

PALO PINTO County · District 7 · BJB TRANSPORT LLC · PALO PINTO CO. REG. (GAS)

RRC Lookup

Permits

4

Max Depth

4,200 ft

First Permit

1985-01-22

Latest Activity

1998-05-29

Lifespan

13 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

1995-02-16

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Production operator mismatch

Scheduling: BJB TRANSPORT LLC ≠ Production: EVARADO OIL COMPANY (reported 2006-04)

!

EWA / Permit operator mismatch

Scheduling: BJB TRANSPORT LLC ≠ Permit: DYNAMIC PRODUCTION, INC.

Resolved via: schedulingBJB TRANSPORT LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-06

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#432983 A DYNAMIC PRODUCTION, INC.
received 1998-04-14
#476650 A DYNAMIC PRODUCTION, INC.
received 1998-04-14
#432983 A JACKSON ENERGY DEVELOPMENT, INC.
received 1995-02-16
#264780 A RAW ENERGY CORPORATION
received 1985-01-21

Well Details

Well Number
4
Max Depth
4,200 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1995-02-16

Operator

Location
WOODSON
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G, OPRS/O
Total Permits
1

External Links

Live © 2026 Petrora