42-363-33622

Plug Dry Hole (P&A)

MCMILLAN

PALO PINTO County · District 7 · WILDCAT

RRC Lookup

Permits

1

Max Depth

5,100 ft

First Permit

1985-08-15

Latest Activity

1985-08-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1987-04-06

!

EWA / Permit operator mismatch

Scheduling: DALLAS PRODUCTION INC. ≠ Permit: DALLAS PRODUCTION, INC.

Resolved via: schedulingDALLAS PRODUCTION INC.

Operator History

originally filed by DALLAS PRODUCTION, INC. — asset transferred

Permit Applications (2)

#282613 A DALLAS PRODUCTION, INC.
received 1985-09-03
#282613 A DALLAS PRODUCTION, INC.
received 1985-08-15

Well Details

Well Number
2
Max Depth
5,100 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Operator

External Links

Live © 2026 Petrora