42-363-33642

Final Completion

CALVIN-MCCLURE

PALO PINTO County · District 7 · ECHO PRODUCTION INC. · BRAZOS RIVER (ATOKA D )

RRC Lookup

Permits

1

Max Depth

4,400 ft

First Permit

1985-09-27

Latest Activity

1985-09-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-11-07

Shut-In

Plugged

2015-09-16

!

EWA / Permit operator mismatch

Scheduling: ECHO PRODUCTION INC. ≠ Permit: DALLAS PRODUCTION, INC.

Resolved via: schedulingECHO PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2015-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#286005 A DALLAS PRODUCTION, INC.
received 1985-09-27

Well Details

Well Number
2
Max Depth
4,400 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1985-11-07

Operator

Location
GRAHAM
P-5 Status
Y (filed 2026-01-04)
Cum Oil (all leases)
6,771,867 bbl
Cum Gas (all leases)
24,989,300 mcf
Activities
CSGD/P, G/PUR
Total Permits
296

External Links

Live © 2026 Petrora