42-363-33643

Final Completion

MILLS J. J. B

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · FLOODPLAIN (STRAWN)

RRC Lookup

Permits

1

Max Depth

3,650 ft

First Permit

1985-09-30

Latest Activity

1985-09-30

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-10-25

Shut-In

Plugged

1997-12-17

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: AUSTRAL OIL COMPANY INCORPORATED (reported 1995-07)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: GSG ROYALTY CORPORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#286127 A GSG ROYALTY CORPORATION
received 1985-09-30

Well Details

Well Number
1
Max Depth
3,650 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1985-10-25

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora