42-363-33779
Final CompletionSTEPHEN PAUL
PALO PINTO County · District 7 · SAGUARO PETROLEUM LLC · STRAWN NW. (MARBLE FALLS)
Permits
1
Max Depth
4,400 ft
First Permit
1986-11-19
Latest Activity
1986-11-19
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1986-12-09
Shut-In
—
Plugged
2025-08-01
!
EWA / Production operator mismatch
Scheduling: SAGUARO PETROLEUM LLC ≠ Production: PALO PINTO BOND COMPANY, LLC (reported 2020-01)
!
EWA / Permit operator mismatch
Scheduling: SAGUARO PETROLEUM LLC ≠ Permit: UPHAM, CHESTER R., JR.
Resolved via: scheduling → SAGUARO PETROLEUM LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#323195 A UPHAM, CHESTER R., JR.
received 1986-11-17
Well Details
- Well Number
- 3
- Max Depth
- 4,400 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 7
- Operator
- SAGUARO PETROLEUM LLC
- Completed
- 1986-12-09
Operator
- Name
- SAGUARO PETRO, LLC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-05-02)
- Cum Oil (all leases)
- 665,072 bbl
- Cum Gas (all leases)
- 1,036,324 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 42