42-363-33815

Final Completion

WILBAR HAZEL

PALO PINTO County · District 7 · UPHAM CHESTER R. JR. · LONG RANCH (BEND CONGL.)

RRC Lookup

Permits

2

Max Depth

4,000 ft

First Permit

1987-02-13

Latest Activity

1991-11-07

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-06-28

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: UPHAM CHESTER R. JR. ≠ Production: SAGUARO PETROLEUM, LLC (reported 2020-02)

Resolved via: schedulingUPHAM CHESTER R. JR.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#393608 A UPHAM, CHESTER R., JR.
received 1991-11-04
#326567 A UPHAM, CHESTER R., JR.
received 1987-02-13

Well Details

Well Number
2
Max Depth
4,000 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1987-06-28

Operator

Location
MINERAL WEL, LS
P-5 Status
Y (filed 2003-09-05)
Cum Oil (all leases)
588,799 bbl
Cum Gas (all leases)
7,758,579 mcf
Total Permits
224

External Links

Live © 2026 Petrora