42-363-33834

Final Completion

WILBAR HAZEL

PALO PINTO County · District 7 · UPHAM OIL & GAS COMPANY · W.G.C. (STRAWN)

RRC Lookup

Permits

1

Max Depth

4,500 ft

First Permit

1987-05-08

Latest Activity

1987-05-08

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2008-02-11

Shut-In

Plugged

2012-04-06

!

EWA / Permit operator mismatch

Scheduling: UPHAM OIL & GAS COMPANY ≠ Permit: UPHAM, CHESTER R., JR.

Resolved via: schedulingUPHAM OIL & GAS COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2012-04

Operator History

originally filed by UPHAM, CHESTER R., JR. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#329708 A UPHAM, CHESTER R., JR.
received 1987-05-01

Well Details

Well Number
3
Max Depth
4,500 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
2008-02-11

Operator

Location
MINERAL WEL, LS
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
971,774 bbl
Cum Gas (all leases)
40,981,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
141

External Links

Live © 2026 Petrora