42-363-33886

Final Completion

COLLINS P. H. UNIT

PALO PINTO County · District 7 · ANDERSON E. D. · BARTONS CHAPEL S. (STRAWN 3200)

RRC Lookup

Permits

3

Max Depth

4,900 ft

First Permit

1987-10-26

Latest Activity

2000-03-08

Lifespan

12 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-06-10

Shut-In

Plugged

2024-08-15

!

EWA / Production operator mismatch

Scheduling: ANDERSON E. D. ≠ Production: FAIRWAY RESOURCES OPERATING, LLC (reported 2009-02)

Resolved via: schedulingANDERSON E. D.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2024-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Well Details

Well Number
2
Max Depth
4,900 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1997-06-10

Operator

Location
CISCO
P-5 Status
Y (filed 2009-10-02)
Cum Oil (all leases)
112,805 bbl
Cum Gas (all leases)
8,650,492 mcf
Total Permits
96

External Links

Live © 2026 Petrora