42-363-34093

Final Completion

BOUNDS

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · CLYDE HARPER (CONGLOMERATE)

RRC Lookup

Permits

1

Max Depth

4,300 ft

First Permit

1991-07-26

Latest Activity

1991-07-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-08-30

Shut-In

Plugged

1995-05-02

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: K & M EXPLORATION, 1973-3 LTD. (reported 1994-01)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: K & M EXPLORATION, 1973-3 LTD.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-05

Operator History

originally filed by K & M EXPLORATION, 1973-3 LTD. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#390194 A K & M EXPLORATION, 1973-3 LTD.
received 1991-07-24

Well Details

Well Number
1
Max Depth
4,300 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1991-08-30

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora