42-363-34140

Final Completion

FORD

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · PARRY (STRAWN)

RRC Lookup

Permits

1

Max Depth

2,000 ft

First Permit

1992-05-28

Latest Activity

1992-05-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1992-06-26

Shut-In

Plugged

2000-06-23

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: K & M EXPLORATION, 1973-3 LTD. (reported 1996-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: K & M EXPLORATION, 1973-3 LTD.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2000-06

Operator History

originally filed by K & M EXPLORATION, 1973-3 LTD. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#399664 A K & M EXPLORATION, 1973-3 LTD.
received 1992-05-26

Well Details

Well Number
3A
Max Depth
2,000 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1992-06-26

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora