42-363-34279

Final Completion

RIEBE GEORGE

PALO PINTO County · District 7 · TRACER OPERATING INC. · STRAWN NW. (MARBLE FALLS)

RRC Lookup

Permits

2

Max Depth

4,200 ft

First Permit

1994-05-16

Latest Activity

1995-05-23

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

2014-09-04

!

EWA / Production operator mismatch

Scheduling: TRACER OPERATING INC. ≠ Production: HUNTER ENERGY, INC. (reported 2008-12)

!

EWA / Permit operator mismatch

Scheduling: TRACER OPERATING INC. ≠ Permit: ATHENA RESOURCES, INC.

Resolved via: schedulingTRACER OPERATING INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-07

Last Production

2014-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#436165 A ATHENA RESOURCES, INC.
received 1995-05-23
#423681 A ATHENA RESOURCES, INC.
received 1994-05-06

Well Details

Well Number
1A
Max Depth
4,200 ft
Drill Type
Vertical
County
PALO PINTO
District
7

Operator

Location
GRAHAM
P-5 Status
Y (filed 2025-07-04)
Cum Oil (all leases)
323,345 bbl
Cum Gas (all leases)
5,615,485 mcf
Activities
OPRS/G, OPRS/O
Total Permits
81

External Links

Live © 2026 Petrora