42-363-34315

Final Completion [SWD] Water

ATHENA-RIEBE SWD

PALO PINTO County · District 7 · SMITH PIPE OF ABILENE · THREE MUSKATEERS (STRAWN)

RRC Lookup

Permits

1

Max Depth

2,400 ft

First Permit

1994-09-28

Latest Activity

1994-09-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1994-11-02

Shut-In

Plugged

2005-03-09

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: ATHENA RESOURCES, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-11

Last Production

2008-03

Operator History

originally filed by ATHENA RESOURCES, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#428371 A ATHENA RESOURCES, INC.
received 1994-09-23

Well Details

Well Number
1
Max Depth
2,400 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
1994-11-02

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora