42-363-34806
Final CompletionMCCLURE-WAGNON
PALO PINTO County · District 9 · J.A.M. PRODUCTION · BARTONS CHAPEL S. (STRAWN 3200)
Permits
1
Max Depth
4,000 ft
First Permit
1998-12-03
Latest Activity
1998-12-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1999-01-10
Shut-In
—
Plugged
2008-11-05
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1999-01
Last Production
2008-11
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#481179 A J.A.M. PRODUCTION
received 1998-11-30
Well Details
- Well Number
- 2
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 9
- Operator
- J.A.M. PRODUCTION
- Completed
- 1999-01-10
Operator
- Name
- J.A.M. PROD
- Location
- GRAHAM
- P-5 Status
- Y (filed 2022-02-04)
- Cum Oil (all leases)
- 66,648 bbl
- Cum Gas (all leases)
- 1,000,767 mcf
- Total Permits
- 11