42-363-34806

Final Completion

MCCLURE-WAGNON

PALO PINTO County · District 9 · J.A.M. PRODUCTION · BARTONS CHAPEL S. (STRAWN 3200)

RRC Lookup

Permits

1

Max Depth

4,000 ft

First Permit

1998-12-03

Latest Activity

1998-12-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1999-01-10

Shut-In

Plugged

2008-11-05

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1999-01

Last Production

2008-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#481179 A J.A.M. PRODUCTION
received 1998-11-30

Well Details

Well Number
2
Max Depth
4,000 ft
Drill Type
Vertical
County
PALO PINTO
District
9
Completed
1999-01-10

Operator

Location
GRAHAM
P-5 Status
Y (filed 2022-02-04)
Cum Oil (all leases)
66,648 bbl
Cum Gas (all leases)
1,000,767 mcf
Total Permits
11

External Links

Live © 2026 Petrora