42-363-34960
Final CompletionMCCLURE-WAGNON A
PALO PINTO County · District 9 · J.A.M. PRODUCTION · BARTONS CHAPEL S. (STRAWN 3200)
Permits
1
Max Depth
4,999 ft
First Permit
2000-09-11
Latest Activity
2000-09-11
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2000-12-28
Shut-In
—
Plugged
2008-11-03
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2000-12
Last Production
2008-11
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#499463 A J.A.M. PRODUCTION
received 2000-09-11
Well Details
- Well Number
- 2
- Max Depth
- 4,999 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 9
- Operator
- J.A.M. PRODUCTION
- Completed
- 2000-12-28
Operator
- Name
- J.A.M. PROD
- Location
- GRAHAM
- P-5 Status
- Y (filed 2022-02-04)
- Cum Oil (all leases)
- 66,648 bbl
- Cum Gas (all leases)
- 1,000,767 mcf
- Total Permits
- 11