42-363-34968

Final Completion

COLLINS P. H. UNIT

PALO PINTO County · District 9 · PROCO OPERATING CO. INC. · BARTONS CHAPEL S. (STRAWN 3200)

RRC Lookup

Permits

1

Max Depth

4,999 ft

First Permit

2000-10-03

Latest Activity

2000-10-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2001-01-09

Shut-In

Plugged

2024-06-17

!

EWA / Production operator mismatch

Scheduling: PROCO OPERATING CO. INC. ≠ Production: FAIRWAY RESOURCES OPERATING, LLC (reported 2013-10)

!

EWA / Permit operator mismatch

Scheduling: PROCO OPERATING CO. INC. ≠ Permit: ANDERSON, E. D.

Resolved via: schedulingPROCO OPERATING CO. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2001-01

Last Production

2024-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#500368 A ANDERSON, E. D.
received 2000-10-03

Well Details

Well Number
17
Max Depth
4,999 ft
Drill Type
Vertical
County
PALO PINTO
District
9
Completed
2001-01-09

Operator

Location
GRAFORD
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
104,094 bbl
Cum Gas (all leases)
1,514,197 mcf
Activities
OPRS/G, OPRS/O
Total Permits
74

External Links

Live © 2026 Petrora