42-363-35085

Final Completion

LANGFORD H

PALO PINTO County · District 7 · HUNTER ENERGY INC. · JOHNSTON GAP (MARBLE FALLS)

RRC Lookup

Permits

1

Max Depth

4,450 ft

First Permit

2002-04-26

Latest Activity

2002-04-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2002-09-03

Shut-In

Plugged

2023-03-01

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2002-09

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#519487 A HUNTER ENERGY, INC.
received 2002-04-26

Well Details

Well Number
1
Max Depth
4,450 ft
Drill Type
Vertical
County
PALO PINTO
District
7
Completed
2002-09-03

Operator

Location
HURST
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
26,240 bbl
Cum Gas (all leases)
979,682 mcf
Activities
OPRS/G, OPRS/O
Total Permits
11

External Links

Live © 2026 Petrora