42-363-35746
Final CompletionNICHOLS
PALO PINTO County · District 7 · MCCOWN ENGINEERING · PALO PINTO CO. REG. (GAS)
Permits
1
Max Depth
4,000 ft
First Permit
2008-02-21
Latest Activity
2008-02-21
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2008-08-31
Shut-In
—
Plugged
2016-10-13
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2008-02
Last Production
2016-10
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#655297 A MCCOWN ENGINEERING
received 2008-02-14
Well Details
- Well Number
- 1
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- PALO PINTO
- District
- 7
- Operator
- MCCOWN ENGINEERING
- Completed
- 2008-08-31
Operator
- Name
- MCCOWN ENGINEERING
- Location
- WICHITA FAL, LS
- P-5 Status
- Y (filed 2018-12-07)
- Cum Oil (all leases)
- 51,722 bbl
- Cum Gas (all leases)
- 13,512 mcf
- Total Permits
- 5