42-363-35891

INJECTION

COWLEY A

PALO PINTO County · District 9 · SALT OF THE EARTH ENERGY LLC · NEWARK EAST (BARNETT SHALE)

RRC Lookup

Permits

1

Max Depth

5,500 ft

First Permit

2009-01-02

Latest Activity

2009-01-02

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2014-09-30

Shut-In

Plugged

P-5 Org Status: Delinquent

!

EWA / Production operator mismatch

Scheduling: SALT OF THE EARTH ENERGY LLC ≠ Production: DALLAS PRODUCTION, INC. (reported 2013-05)

!

EWA / Permit operator mismatch

Scheduling: SALT OF THE EARTH ENERGY LLC ≠ Permit: DALLAS PRODUCTION, INC.

Resolved via: schedulingSALT OF THE EARTH ENERGY LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2009-06

Last Production

2026-03

Operator History

originally filed by DALLAS PRODUCTION, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#676646 A DALLAS PRODUCTION, INC.
received 2008-12-22

Well Details

Well Number
1
Max Depth
5,500 ft
Drill Type
Vertical
County
PALO PINTO
District
9
Completed
2014-09-30

Operator

Location
MONTGOMERY
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
170 bbl
Cum Gas (all leases)
15,147 mcf
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora