42-363-36073

Final Completion

HALSELL RANCH

PALO PINTO County · District 9 · TEXXOL OPERATING COMPANY INC. · KRS (MARBLE FALLS)

RRC Lookup

Permits

1

Max Depth

6,000 ft

First Permit

2012-05-04

Latest Activity

2012-05-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2012-07-25

Shut-In

Plugged

2025-09-25

!

EWA / Production operator mismatch

Scheduling: TEXXOL OPERATING COMPANY INC. ≠ Production: EAGLERIDGE OPERATING, LLC (reported 2023-09)

!

EWA / Permit operator mismatch

Scheduling: TEXXOL OPERATING COMPANY INC. ≠ Permit: SWAN PC, LP

Resolved via: schedulingTEXXOL OPERATING COMPANY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2010-09

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#738897 A SWAN PC, LP
received 2012-04-24

Well Details

Well Number
S 6
Max Depth
6,000 ft
Drill Type
Vertical
County
PALO PINTO
District
9
Completed
2012-07-25

Operator

Location
FORT WORTH
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
467,765 bbl
Cum Gas (all leases)
42,961,519 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
19

External Links

Live © 2026 Petrora