42-365-30771

INJECTION

HIGHWAY 59 SOUTH SWD

PANOLA County · District 6 · PINNERGY LTD. · CARTHAGE (TRAVIS PEAK)

RRC Lookup

Permits

3

Max Depth

9,600 ft

First Permit

1978-07-12

Latest Activity

1998-08-28

Lifespan

20 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2005-05-28

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: PINNERGY LTD. ≠ Production: GULFSTREAM OIL & GAS, INC. (reported 1999-12)

!

EWA / Permit operator mismatch

Scheduling: PINNERGY LTD. ≠ Permit: PARK & PARK OIL CO.

Resolved via: schedulingPINNERGY LTD.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by PARK & PARK OIL CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#479112 A PARK & PARK OIL CO.
received 1998-08-28
#396285 A UNION PACIFIC RESOURCES COMPANY
received 1992-01-29
#28327 A HUNT OIL COMPANY
received 1978-07-12

Well Details

Well Number
2
Max Depth
9,600 ft
Drill Type
Vertical
County
PANOLA
District
6
Operator
PINNERGY LTD.
Completed
2005-05-28

Operator

Location
AUSTIN
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G, OPRS/O
Total Permits
21

External Links

Live © 2026 Petrora