42-365-31834

Final Completion

UNITED GAS PIPELINE CO.

PANOLA County · District 6 · TRI-STATE PIPE & EQUIPMENT INC. · DEBERRY N. (TRAVIS PEAK 6200)

RRC Lookup

Permits

1

Max Depth

7,000 ft

First Permit

1986-10-23

Latest Activity

1986-10-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-03-14

Shut-In

Plugged

1992-02-01

!

EWA / Permit operator mismatch

Scheduling: TRI-STATE PIPE & EQUIPMENT INC. ≠ Permit: HPC OPERATING, INC.

Resolved via: schedulingTRI-STATE PIPE & EQUIPMENT INC.

Operator History

originally filed by HPC OPERATING, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#322063 A HPC OPERATING, INC.
received 1986-10-20

Well Details

Well Number
1
Max Depth
7,000 ft
Drill Type
Vertical
County
PANOLA
District
6
Completed
1987-03-14

Operator

Location
MARSHALL
P-5 Status
Y (filed 1993-01-05)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora