42-365-32254

Final Completion

HARRIS S.S. UNIT

PANOLA County · District 6 · CHEVRON U. S. A. INC. · CARTHAGE (COTTON VALLEY)

RRC Lookup

Permits

1

Max Depth

11,500 ft

First Permit

1989-12-18

Latest Activity

1989-12-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-05-02

Shut-In

Plugged

2018-12-02

!

EWA / Permit operator mismatch

Scheduling: CHEVRON U. S. A. INC. ≠ Permit: TEXACO PRODUCING INC.

Resolved via: schedulingCHEVRON U. S. A. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2018-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#367597 A TEXACO PRODUCING INC.
received 1989-12-13

Well Details

Well Number
5
Max Depth
11,500 ft
Drill Type
Vertical
County
PANOLA
District
6
Completed
1991-05-02

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
622,347,311 bbl
Cum Gas (all leases)
4,191,207,826 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,225

External Links

Live © 2026 Petrora