42-365-35970

Final Completion

SCHULZE

PANOLA County · District 6 · BROOKSTON ENERGY INC. · BETHANY (PALUXY)

RRC Lookup

Permits

2

Max Depth

10,100 ft

First Permit

2005-11-29

Latest Activity

2005-11-29

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2006-06-02

Shut-In

Plugged

2024-08-14

!

EWA / Production operator mismatch

Scheduling: BROOKSTON ENERGY INC. ≠ Production: EXCO OPERATING COMPANY, LP (reported 2012-02)

!

EWA / Permit operator mismatch

Scheduling: BROOKSTON ENERGY INC. ≠ Permit: WINCHESTER PRODUCTION COMPANY

Resolved via: schedulingBROOKSTON ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2006-02

Last Production

2024-07

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#610060 A WINCHESTER PRODUCTION COMPANY
received 2006-02-20
#610060 A WINCHESTER PRODUCTION COMPANY
received 2005-11-28

Well Details

Well Number
1
Max Depth
10,100 ft
Drill Type
Vertical
County
PANOLA
District
6
Completed
2006-06-02

Operator

Location
TYLER
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
498,418 bbl
Cum Gas (all leases)
26,618,722 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
27

External Links

Live © 2026 Petrora