42-365-38823

PRODUCING Horizontal

TROSPER-TILLER-CRENSHAW HV UNT C

PANOLA County · District 6 · TGNR EAST TEXAS II LLC · CARTHAGE (HAYNESVILLE SHALE)

RRC Lookup

Permits

3

Max Depth

13,000 ft

First Permit

2022-11-30

Latest Activity

2022-11-30

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2023-07-08

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: TGNR EAST TEXAS II LLC ≠ Permit: ROCKCLIFF ENERGY OPERATING LLC

Resolved via: productionTGNR EAST TEXAS II LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2023-07

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#885844 A TGNR EAST TEXAS II LLC
received 2024-05-09
#885844 A ROCKCLIFF ENERGY OPERATING LLC
received 2023-01-05
#885844 A ROCKCLIFF ENERGY OPERATING LLC
received 2022-11-18
Lat 32.312335
Lon -94.063156

Well Details

Well Number
3H
Max Depth
13,000 ft
Drill Type
Horizontal
County
PANOLA
District
6
Completed
2023-07-08

Operator

Location
HOUSTON
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
3,556 bbl
Cum Gas (all leases)
846,950,289 mcf
Activities
G/PUR, GTHS/G, OPRS/G, OPRS/O
Total Permits
122

External Links

Live © 2026 Petrora