Permits
1
Max Depth
3,400 ft
First Permit
1977-12-09
Latest Activity
1977-12-09
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-10-01
Shut-In
—
Plugged
1986-03-03
!
EWA / Permit operator mismatch
Scheduling: COPE ENERGY GROUP INC. ≠ Permit: VISTA RESOURCES, INC.
Resolved via: scheduling → COPE ENERGY GROUP INC.
Operator History
originally filed by VISTA RESOURCES, INC. — asset transferred
Permit History (1)
Permit Applications (1)
#13719 A VISTA RESOURCES, INC.
received 1977-12-09
Well Details
- Well Number
- 1
- Max Depth
- 3,400 ft
- Drill Type
- Vertical
- County
- PARKER
- District
- 7
- Operator
- COPE ENERGY GROUP INC.
- Completed
- 1980-10-01
Operator
- Name
- COPE ENGY GROUP INC
- Location
- FORT WORTH
- P-5 Status
- Y (filed 1984-01-13)
- Total Permits
- 6