42-367-31176

Final Completion

POWELL HELEN

PARKER County · District 7 · ALBERT DAVID OIL & GAS · TOTO (CADDO CONGLOMERATE)

RRC Lookup

Permits

1

Max Depth

4,300 ft

First Permit

1978-06-01

Latest Activity

1978-06-01

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1978-08-01

Shut-In

Plugged

1995-09-07

!

EWA / Permit operator mismatch

Scheduling: ALBERT DAVID OIL & GAS ≠ Permit: POLK & PATTON, INC.

Resolved via: schedulingALBERT DAVID OIL & GAS

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-09

Operator History

originally filed by POLK & PATTON, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#25621 A POLK & PATTON, INC.
received 1978-06-01

Well Details

Well Number
1
Max Depth
4,300 ft
Drill Type
Vertical
County
PARKER
District
7
Completed
1978-08-01

Operator

Location
DALLAS
P-5 Status
Y (filed 2004-10-08)
Cum Oil (all leases)
26,218 bbl
Cum Gas (all leases)
1,343,080 mcf
Total Permits
25

External Links

Live © 2026 Petrora