42-367-31613
Final CompletionMADDUX
PARKER County · District 7 · SMITH PIPE OF ABILENE · BETHESDA (BIG SALINE)
Permits
1
Max Depth
4,600 ft
First Permit
1979-04-26
Latest Activity
1979-04-26
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-01-10
Shut-In
—
Plugged
1994-02-14
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEELY OIL CO.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1994-02
Operator History
originally filed by SEELY OIL CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#47260 A SEELY OIL CO.
received 1979-04-26
Well Details
- Well Number
- 1
- Max Depth
- 4,600 ft
- Drill Type
- Vertical
- County
- PARKER
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1980-01-10
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf