42-367-31613

Final Completion

MADDUX

PARKER County · District 7 · SMITH PIPE OF ABILENE · BETHESDA (BIG SALINE)

RRC Lookup

Permits

1

Max Depth

4,600 ft

First Permit

1979-04-26

Latest Activity

1979-04-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-01-10

Shut-In

Plugged

1994-02-14

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SEELY OIL CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-02

Operator History

originally filed by SEELY OIL CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#47260 A SEELY OIL CO.
received 1979-04-26

Well Details

Well Number
1
Max Depth
4,600 ft
Drill Type
Vertical
County
PARKER
District
7
Completed
1980-01-10

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora