42-367-31709

Final Completion

FOSTER ESTATE

PARKER County · District 7 · DALLAS PRODUCTION INC. · MUIR (STRAWN 4400)

RRC Lookup

Permits

1

Max Depth

6,000 ft

First Permit

1979-08-15

Latest Activity

1979-08-15

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-04-10

Shut-In

Plugged

1996-03-07

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1996-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#55694 A DALLAS PRODUCTION, INC.
received 1979-08-15

Well Details

Well Number
1
Max Depth
6,000 ft
Drill Type
Vertical
County
PARKER
District
7
Completed
1980-04-10

Operator

Location
DALLAS
P-5 Status
Y (filed 2020-12-04)
Cum Oil (all leases)
3,138,597 bbl
Cum Gas (all leases)
150,942,979 mcf
Total Permits
823

External Links

Live © 2026 Petrora