42-367-32854

Final Completion

HOWARD

PARKER County · District 7 · SMITH PIPE OF ABILENE · KIDD (STRAWN UPPER)

RRC Lookup

Permits

2

Max Depth

2,000 ft

First Permit

1985-01-22

Latest Activity

1986-02-13

Lifespan

1 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-10-29

Shut-In

Plugged

2000-07-31

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TAG PRODUCTION, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2000-07

Operator History

originally filed by TAG PRODUCTION, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#297698 A TAG PRODUCTION, INC.
received 1986-02-03
#264864 A TAG PRODUCTION, INC.
received 1985-01-22

Well Details

Well Number
1
Max Depth
2,000 ft
Drill Type
Vertical
County
PARKER
District
7
Completed
1985-10-29

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora