42-371-00049
Final CompletionSTATE HART
PECOS County · District 8 · CHISOS OPERATING INC. · ABELL EAST (WADDELL W. SEG.)
Permits
1
Max Depth
6,075 ft
First Permit
2004-06-30
Latest Activity
2004-06-30
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1996-11-18
!
EWA / Production operator mismatch
Scheduling: CHISOS OPERATING INC. ≠ Production: G P II ENERGY, INC. (reported 2012-04)
!
EWA / Permit operator mismatch
Scheduling: CHISOS OPERATING INC. ≠ Permit: G P II ENERGY, INC.
Resolved via: scheduling → CHISOS OPERATING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2013-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#547106 A G P II ENERGY, INC.
received 2004-06-17
Well Details
- Well Number
- 1
- Max Depth
- 6,075 ft
- Drill Type
- Vertical
- County
- PECOS
- District
- 8
- Operator
- CHISOS OPERATING INC.
Operator
- Name
- CHISOS OPER, INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 437,940 bbl
- Cum Gas (all leases)
- 42,333,071 mcf
- Activities
- OPRS/G
- Total Permits
- 62