42-371-01668

Final Completion

UNIVERSITY

PECOS County · District 8 · MID-AMERICA PETROLEUM INC. · TAYLOR LINK

RRC Lookup

Permits

1

Max Depth

1,735 ft

First Permit

1983-05-19

Latest Activity

1983-05-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1995-09-26

!

EWA / Permit operator mismatch

Scheduling: MID-AMERICA PETROLEUM INC. ≠ Permit: DEEMAR PRODUCTION COMPANY

Resolved via: schedulingMID-AMERICA PETROLEUM INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Operator History

originally filed by DEEMAR PRODUCTION COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#195651 A DEEMAR PRODUCTION COMPANY
received 1983-05-19

Well Details

Well Number
4
Max Depth
1,735 ft
Drill Type
Vertical
County
PECOS
District
8

Operator

Location
MIDLAND
P-5 Status
Y (filed 1990-06-15)
Total Permits
212

External Links

Live © 2026 Petrora