42-371-04809

Final Completion

STATE HART

PECOS County · District 8 · MITCHELL GEORGE H. · ABELL EAST (MCKEE)

RRC Lookup

Permits

1

Max Depth

6,100 ft

First Permit

2004-05-04

Latest Activity

2004-05-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

1984-06-25

!

EWA / Production operator mismatch

Scheduling: MITCHELL GEORGE H. ≠ Production: BEACH OIL & GAS, INC. (reported 2021-04)

!

EWA / Permit operator mismatch

Scheduling: MITCHELL GEORGE H. ≠ Permit: G P II ENERGY, INC.

Resolved via: schedulingMITCHELL GEORGE H.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#545188 A G P II ENERGY, INC.
received 2004-04-30

Well Details

Well Number
4
Max Depth
6,100 ft
Drill Type
Vertical
County
PECOS
District
8

Operator

Location
KERMIT
P-5 Status
Y (filed 1988-06-15)
Total Permits
10

External Links

Live © 2026 Petrora