42-371-05383

PRODUCING

GERETY

PECOS County · District 8 · SOIL ENERGY INC. · ABELL (CLEAR FORK)

RRC Lookup

Permits

1

Max Depth

5,340 ft

First Permit

1989-03-09

Latest Activity

1989-03-09

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1989-02-01

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: SOIL ENERGY INC. ≠ Permit: HODGES, BILLY M.

Resolved via: schedulingSOIL ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#356247 A HODGES, BILLY M.
received 1989-02-21

Well Details

Well Number
2
Max Depth
5,340 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
1989-02-01

Operator

Location
IMPERIAL
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
22,360 bbl
Cum Gas (all leases)
233,935 mcf
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora