42-371-30167
Final CompletionPECOS -B- FEE
PECOS County · District 8 · TEXACO INC. · ROJO CABALLOS W. (DELAWARE)
Permits
1
Max Depth
5,600 ft
First Permit
2007-04-27
Latest Activity
2007-04-27
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1969-09-07
Shut-In
—
Plugged
1972-04-11
!
EWA / Production operator mismatch
Scheduling: TEXACO INC. ≠ Production: SHENANDOAH PETROLEUM CORPORATION (reported 2020-10)
!
EWA / Permit operator mismatch
Scheduling: TEXACO INC. ≠ Permit: SHENANDOAH PETROLEUM CORPORATION
Resolved via: scheduling → TEXACO INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2006-12
Last Production
2026-03
Operator History
originally filed by SHENANDOAH PETROLEUM CORPORATION — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#636191 A SHENANDOAH PETROLEUM CORPORATION
received 2007-03-29
Well Details
- Well Number
- 3W
- Max Depth
- 5,600 ft
- Drill Type
- Vertical
- County
- PECOS
- District
- 8
- Operator
- TEXACO INC.
- Completed
- 1969-09-07
Operator
- Name
- TEXACO INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 1992-08-03)
- Total Permits
- 4,906