42-371-32705

Final Completion

SMITH B.L.

PECOS County · District 8 · STANOLIND OPERATING CORP. · PECOS VALLEY (WOLFCAMP)

RRC Lookup

Permits

1

Max Depth

5,850 ft

First Permit

1979-02-16

Latest Activity

1979-02-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-03-15

Shut-In

Plugged

2008-01-10

!

EWA / Production operator mismatch

Scheduling: STANOLIND OPERATING CORP. ≠ Production: B & B ENERGY (I) (reported 1997-01)

!

EWA / Permit operator mismatch

Scheduling: STANOLIND OPERATING CORP. ≠ Permit: HILLIN PROD. CO.

Resolved via: schedulingSTANOLIND OPERATING CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-03

Operator History

originally filed by HILLIN PROD. CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#42702 A HILLIN PROD. CO.
received 1979-02-16

Well Details

Well Number
2
Max Depth
5,850 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
1980-03-15

Operator

Location
MIDLAND
P-5 Status
Y (filed 2010-03-05)
Cum Oil (all leases)
683,806 bbl
Cum Gas (all leases)
679,249 mcf
Total Permits
32

External Links

Live © 2026 Petrora