42-371-32853

Final Completion

SMITH MYRON A. -D-

PECOS County · District 8 · OLSEN ENERGY INC. · LEHN-APCO (1600)

RRC Lookup

Permits

3

Max Depth

5,200 ft

First Permit

1979-08-20

Latest Activity

2017-07-12

Lifespan

38 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2017-07-01

Shut-In

Plugged

2024-01-26

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2024-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#828541 A OLSEN ENERGY INC.
received 2017-07-06
#343783 A NATIONAL COOP REFINERY ASSOC
received 1988-03-11
#55973 A NATIONAL COOP REFINERY ASSOC
received 1979-08-20
Lat 31.088129
Lon -102.721023

Well Details

Well Number
2
Max Depth
5,200 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
2017-07-01

Operator

Location
BOERNE
P-5 Status
Y (filed 2025-05-02)
Cum Oil (all leases)
4,625,010 bbl
Cum Gas (all leases)
40,523,652 mcf
Activities
OPRS/G, OPRS/O
Total Permits
242

External Links

Live © 2026 Petrora