42-371-33645

Final Completion

MCDONALD 46

PECOS County · District 8 · OLSEN ENERGY INC. · WENTZ (SAN ANDRES)

RRC Lookup

Permits

3

Max Depth

4,500 ft

First Permit

1981-11-12

Latest Activity

1997-07-03

Lifespan

16 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-07-05

Shut-In

Plugged

2020-08-10

!

EWA / Permit operator mismatch

Scheduling: OLSEN ENERGY INC. ≠ Permit: R.K.G. OPERATIONS, INC.

Resolved via: schedulingOLSEN ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#464282 A R.K.G. OPERATIONS, INC.
received 1998-05-11
#464282 A R.K.G. OPERATIONS, INC.
received 1997-06-26
#140466 A R. K. G. ENGINEERING, INC.
received 1981-11-12

Well Details

Well Number
6
Max Depth
4,500 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
1997-07-05

Operator

Location
BOERNE
P-5 Status
Y (filed 2025-05-02)
Cum Oil (all leases)
4,625,010 bbl
Cum Gas (all leases)
40,523,652 mcf
Activities
OPRS/G, OPRS/O
Total Permits
242

External Links

Live © 2026 Petrora