42-371-33690
Final CompletionWEATHERBY IVY B.
PECOS County · District 8 · CHEVRON U. S. A. INC. · ROJO CABALLOS (DELAWARE)
Permits
1
Max Depth
5,600 ft
First Permit
1981-12-18
Latest Activity
1981-12-18
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-01-12
Shut-In
—
Plugged
1991-07-03
!
EWA / Permit operator mismatch
Scheduling: CHEVRON U. S. A. INC. ≠ Permit: GULF OIL CORP.
Resolved via: scheduling → CHEVRON U. S. A. INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2022-02
Operator History
originally filed by GULF OIL CORP. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#144948 A GULF OIL CORP.
received 1981-12-18
Well Details
- Well Number
- 4
- Max Depth
- 5,600 ft
- Drill Type
- Vertical
- County
- PECOS
- District
- 8
- Operator
- CHEVRON U. S. A. INC.
- Completed
- 1982-01-12
Operator
- Name
- TEXACO E & P INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-11-04)
- Cum Oil (all leases)
- 622,347,311 bbl
- Cum Gas (all leases)
- 4,191,207,826 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 9,225