42-371-34747
Final CompletionTXL FEE 35
PECOS County · District 8 · MINERAL TECHNOLOGIES INC. · GOMEZ (WOLFCAMP UPPER)
Permits
1
Max Depth
12,600 ft
First Permit
1984-02-10
Latest Activity
1984-02-10
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-05-19
Shut-In
—
Plugged
1998-06-02
!
EWA / Permit operator mismatch
Scheduling: MINERAL TECHNOLOGIES INC. ≠ Permit: TENNECO OIL CO.
Resolved via: scheduling → MINERAL TECHNOLOGIES INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-08
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#229119 A TENNECO OIL CO.
received 1984-02-07
Well Details
- Well Number
- 1
- Max Depth
- 12,600 ft
- Drill Type
- Vertical
- County
- PECOS
- District
- 8
- Operator
- MINERAL TECHNOLOGIES INC.
- Completed
- 1984-05-19
Operator
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-09-04)
- Cum Oil (all leases)
- 1,259,300 bbl
- Cum Gas (all leases)
- 5,177,270 mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 12