42-371-35558

Final Completion

EL WEDO

PECOS County · District 8 · OLSEN ENERGY INC. · CHENOT (WOLFCAMP)

RRC Lookup

Permits

1

Max Depth

5,500 ft

First Permit

1985-07-10

Latest Activity

1985-07-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-08-15

Shut-In

Plugged

2019-09-06

!

EWA / Production operator mismatch

Scheduling: OLSEN ENERGY INC. ≠ Production: R. K. G. ENGINEERING, INC. (reported 2006-07)

!

EWA / Permit operator mismatch

Scheduling: OLSEN ENERGY INC. ≠ Permit: R. K. G. ENGINEERING, INC.

Resolved via: schedulingOLSEN ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2019-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#279836 A R. K. G. ENGINEERING, INC.
received 1985-07-09

Well Details

Well Number
4
Max Depth
5,500 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
1985-08-15

Operator

Location
BOERNE
P-5 Status
Y (filed 2025-05-02)
Cum Oil (all leases)
4,625,010 bbl
Cum Gas (all leases)
40,523,652 mcf
Activities
OPRS/G, OPRS/O
Total Permits
242

External Links

Live © 2026 Petrora