Permits
1
Max Depth
4,400 ft
First Permit
1992-09-30
Latest Activity
1992-09-30
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
1992-12-09
Shut-In
—
Plugged
—
P-5 Org Status: X
!
EWA / Permit operator mismatch
Scheduling: SOIL ENERGY INC. ≠ Permit: COSTA RESOURCES, INC.
Resolved via: production → SOIL ENERGY, INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
COSTA RESOURCES, INC. 1993-1994→ ODESSA EXPLORATION, INC. 1994-1996→ FAGADAU ENERGY CORPORATION 1997-2002→ BC OPERATING, INC. 2003-2004→ CELERO ENERGY, L.P. 2004-2005→ WHITING OIL AND GAS CORPORATION 2005-2006→ ENDEAVOR ENERGY RESOURCES L.P. 2006-2011→ HYBRID OPERATING, INCORPORATED 2011-2018→ SOIL ENERGY, INC. 2018-2025
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#403962 A COSTA RESOURCES, INC.
received 1992-09-28
Well Details
- Well Number
- 2
- Max Depth
- 4,400 ft
- Drill Type
- Vertical
- County
- PECOS
- District
- 8
- Operator
- SOIL ENERGY INC.
- Completed
- 1992-12-09
Operator
- Name
- SOIL ENERGY, INC.
- Location
- IMPERIAL
- P-5 Status
- Y (filed 2025-06-04)
- Cum Oil (all leases)
- 22,360 bbl
- Cum Gas (all leases)
- 233,935 mcf
- Activities
- OPRS/G, OPRS/O