42-371-37723

Final Completion

WEST RANCH

PECOS County · District 8 · SANDRIDGE ENERGY INC. · BITTERWEED S. (CABALLOS)

RRC Lookup

Permits

1

Max Depth

8,500 ft

First Permit

2006-05-02

Latest Activity

2006-05-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2006-10-17

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: SANDRIDGE ENERGY INC. ≠ Production: LONGFELLOW ENERGY, LP (reported 2025-08)

!

EWA / Permit operator mismatch

Scheduling: SANDRIDGE ENERGY INC. ≠ Permit: RIATA ENERGY, INC.

Resolved via: schedulingSANDRIDGE ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2006-08

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#618179 A RIATA ENERGY, INC.
received 2006-04-25

Well Details

Well Number
3212
Max Depth
8,500 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
2006-10-17

Operator

Location
OKLAHOMA CI, TY
P-5 Status
Y (filed 2009-08-07)
Cum Oil (all leases)
186,349 bbl
Cum Gas (all leases)
230,778,023 mcf
Total Permits
698

External Links

Live © 2026 Petrora