42-371-39596

Final Completion

DHI MAYS 127-7

PECOS County · District 8 · CAMBRIAN MANAGEMENT LTD. · WOLFBONE (TREND AREA)

RRC Lookup

Permits

1

Max Depth

12,500 ft

First Permit

2017-08-04

Latest Activity

2017-08-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2017-10-02

Shut-In

Plugged

2019-08-30

!

EWA / Permit operator mismatch

Scheduling: CAMBRIAN MANAGEMENT LTD. ≠ Permit: PEREGRINE PETROLEUM PRTNR, LTD.

Resolved via: schedulingCAMBRIAN MANAGEMENT LTD.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2017-10

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#829484 A PEREGRINE PETROLEUM PRTNR, LTD.
received 2017-08-02
Lat 30.727991
Lon -102.373629

Well Details

Well Number
1
Max Depth
12,500 ft
Drill Type
Vertical
County
PECOS
District
8
Completed
2017-10-02

Operator

Location
MCCAULLEY
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
3,819,696 bbl
Cum Gas (all leases)
1,544,534 mcf
Activities
OPRS/O
Total Permits
107

External Links

Live © 2026 Petrora